Annual Meeting

The annual meeting of the Ruby Ranch Water Supply Corporation (RRWSC) will be held on April 11, 2013 at 7 p.m. at the Ruby Ranch Lodge.  In the RRWSC Bylaws, Ruby Ranch lot owners in sections 3 through 8, even if they do not yet have a water tap, are members of RRWSC and eligible to vote at this meeting.  The RRWSC is separate from the Ruby Ranch Homeowners Association and is run by a separate Board of Directors.

Please attend this meeting to be introduced to the current board members and to discuss the status of our water system.  PGMS, our water system’s operator, and the Board will be available to answer any questions about the new Trinity Aquifer well and the management and future of the water system.

If you are unable to attend you may mail the attached ballot to RRWSC PO Box 1585, Buda, TX. 78610 or hand deliver the ballot to 871 Clark Cove, Buda, TX.  Mailed or hand delivered ballots must be received by noon on April 10, 2013.  Current state law does not allow proxy voting.  The enclosed Agenda and Official Ballot will be used to conduct any business at this meeting. There are 3 at-large director positions available on the board and 3 candidates are running.

Our water system was established in 1997 and has been furnishing water to property owners for close to 16 years.  During this time the system has been a first class and safe water source that has grown and expanded to meet increased demand.

 

Water system work

Last year PGMS, our water operations management company, had performed a routine inspection of our ground storage tanks and made the recommendation to coat the interiors of the oldest tanks at each plant location in order to extend the life of each tank.  PGMS identified potential contractors to do this work and, after receiving several bids, made a contractor recommendation to the Board which the Board accepted, stipulating that the work takes place during the winter months when the demand on our water system is lowest.  Last week the contractor initiated work on the front storage tank at plant #2 (at the far south end of Ruby Ranch Road) and we expect that once plant #2 is totally operational they will commence work at plant #1 (near the 4-way stop).  Simultaneously with the plant # 1 work PGMS will be doing some yard piping work to give us further flexibility on storage tank usage.  We do not expect any impact to the service to any of our customers during this time frame.